Digitised CMM reports, verified by engineers, monitored statistically.
Upload an Oerlikon P40 bevel gear CMM report, review the extracted measurements against the original document, approve them, and track every characteristic against the approved specification with real statistical process control.
Extraction
Image-based P40 reports are read page by page. Nothing is guessed, nothing is inferred, and every value keeps its confidence and source page.
Mandatory verification
No measurement enters the dataset until an engineer has reviewed the extracted values against the original PDF and explicitly approved them.
Specification control
Report limits are kept as historical evidence. Revision-controlled approved limits govern evaluation, always at the revision valid on the measurement date.
SPC and trends
Control limits calculated from the process, kept separate from specification limits, with transparent rules for trends, shifts and variation.